-
If there is one piece of advice you should take away from this website, it’s to plan your End of Warranty (EOW) inspections to ensure there is enough time to inspect all turbines, analyse results, and file claims well in advance of the end-of-warranty date. This cannot be stressed enough because many Original Equipment Manufacturers (OEMs) will not process a warranty claim submitted after the end of the specified warranty period. By planning an EOW inspection well in advance, you maximize the understanding of your wind turbines and any safety, quality, or technical issues they may have.
-
Good planning will afford the inspection team an appropriate window of time to complete the inspections in full, taking time to address critical findings in detail and producing high quality reports that give the owner ample time to report back to the OEM in an appropriate manner and before the end of the warranty period.
Our end of warranty inspection service helps to reduce costs as much as possible by detecting failures of components as early as possible, so you can establish warranty claims.
- Ensure all of your turbines provide efficient production for as long as possible
- Identify defects and detect failures of important components within your warranty period
- Management warranty claims to ensure that the OEM carries out any required repairs
- Minimise service costs through effective warranty claims